# What does a green steel certificate cost in India?

Canonical: https://senseible.earth/answers/green-steel-certificate-cost-india

NISST charges Rs 10,000 plus 18% GST to register each plant, once; Rs 95,000 plus GST for the audit agency; a Rs 25,000 plus GST advance certification fee; and Rs 1,000 per 500 tonnes of finished steel certified, set against that advance.

## The four fees

- Registration: Rs 10,000 plus 18% GST per plant, one time.
- Audit agency fee: Rs 95,000 plus GST.
- Advance certification fee: Rs 25,000 plus GST.
- Certification: Rs 1,000 per 500 tonnes of finished steel certified.

## Also on you

The audit team's travel, lodging and boarding during the audit.

## Example: 50,000 t of finished steel certified

- Certification fee: 50,000 / 500 x Rs 1,000 = Rs 1,00,000
- Less the advance already paid: Rs 25,000
- Balance due at the end: Rs 75,000

The tonnage is an example. Fees are those in NISST's guideline of 2 November 2026.

## What Senseible does here

From your fuel and power bills and your tonnes made, Senseible's CBAM calculator shows tonnes of CO2 per tonne of steel. The official rating comes from NISST's audit on its own method, so treat that figure as a starting point, not a rating.

- [See your CO2 per tonne from your bills](https://senseible.earth/cbam-calculator)
- [How to apply](https://senseible.earth/answers/how-to-get-green-steel-certificate-india)
- [The star bands](https://senseible.earth/answers/green-steel-star-rating-india)
- [How long it stays valid](https://senseible.earth/answers/green-steel-certificate-validity-india)

Sources: [NISST, Guidelines for Green Steel Certification, 2 November 2026](https://nisst.org/wp-content/uploads/2026/11/Guideline-for-Green-Steel-Certification_02.11.2026-1.pdf), [Ministry of Steel notification F. No. 1(6)-2024-ID-2, Taxonomy for Green Steel for India, 23 December 2024, Gazette of India](https://steel.gov.in/sites/default/files/2026-09/Notification%20green%20steel%20taxonomy%20for%20india%2023.12.2024-reg..pdf)

Last reviewed 2026-11-28.
