# What is the minimum factory size required to use Senseible?

Canonical: https://senseible.earth/answers/minimum-size-to-use-senseible

There is no minimum. Senseible works from a single electricity bill, so a one-person workshop and a large plant use the same flow. The free Snapshot plan reads up to 10 bills a month.

- [Try with one bill](https://senseible.earth/)
- [Plans](https://senseible.earth/pricing)
