# What carbon data do foreign buyers ask Peenya precision component exporters for?

Canonical: https://senseible.earth/answers/peenya-precision-component-exporter-buyer-data

Expect Scope 1 and 2 totals with the 0.710 kg CO2 per kWh CEA factor, the share of green power and a figure per part, mostly material plus allocated machining energy. Check whether your parts fall under CBAM: steel fasteners and some steel articles do, machined assemblies of other metals usually do not.

## Typical requests

- Annual Scope 1 and 2.
- Footprint per part or per kg.
- Green tariff or rooftop solar share.

## Allocating plant energy

Machine hours per part are often fairer than weight for precision work. State the method.

## Karnataka power

A BESCOM green tariff lowers the market based figure; the location based figure stays at the national factor.

## What Senseible does here

Senseible reads fuel, electricity and freight invoices into a dated, fingerprinted record per site, so each figure you send a buyer traces back to the documents behind it.

- [Machined part footprint](https://senseible.earth/answers/cnc-machined-part-carbon-footprint)
- [BESCOM green tariff](https://senseible.earth/answers/karnataka-green-tariff-bescom-factories)
- [Are auto components under CBAM](https://senseible.earth/answers/are-auto-components-covered-by-cbam)

Sources: [GHG Protocol Corporate Standard](https://ghgprotocol.org/corporate-standard), [CEA CO2 Baseline Database for the Indian Power Sector](https://cea.nic.in/cdm-co2-baseline-database/?lang=en), [Regulation (EU) 2023/956 (CBAM Regulation), consolidated](https://eur-lex.europa.eu/eli/reg/2023/956/2025-10-20)

Last reviewed 2026-10-21.
