# Solar for a re-rolling mill: does the subsidy or interest support actually cover it?

Canonical: https://senseible.earth/answers/solar-subsidy-for-re-rolling-mill

Not from a central scheme you can apply to today. PM Surya Ghar excludes industrial connections, ADEETIE is for efficiency projects and lists no solar, and MSE-GIFT's 2 percent interest subvention, which named solar, covered loans sanctioned up to 31 March 2026. Plan the plant on an ordinary term loan and your own bills.

## Scheme by scheme

- PM Surya Ghar (Ministry of New and Renewable Energy): residential only. Its guidelines say no central financial assistance goes to non-residential consumers, "including government segment, commercial and industrial segment etc."
- MSE-GIFT (Ministry of MSME, run by SIDBI): eligible projects include "Renewable energy (solar, wind, hydro)". Support is 2 percent a year interest subvention on term loans of Rs 10 lakh to Rs 2 crore, for at most 5 years, for micro and small units, on loans "sanctioned under this financing facility upto and including 31.3.2026".
- ADEETIE (Bureau of Energy Efficiency): 5 percent subvention for micro and small units, 3 percent for medium, for energy efficient technologies that save at least 10 percent energy. Its list of 69 technologies has no solar; for re-rolling it names direct rolling. The list is open, so only BEE's technical committee can approve anything else.
- MSE-SPICE (Ministry of MSME): 25 percent capital subsidy on plant and machinery, capped at Rs 12.5 lakh, for circular economy projects. Its sector list names solar panels only under waste recycling and circular economy projects, not as a plant to install.

## The cap the re-rollers mean

Mongabay India reported on 24 June 2026 that the president of the Chhattisgarh Steel Re-rollers Association sees the cap on subsidies as one reason for poor uptake. The cap it described is MSE-GIFT's: 2 percent a year, for up to five years, on a loan of at most Rs 2 crore.

## If your solar loan was sanctioned by 31 March 2026

Ask your bank whether it signed up with SIDBI for MSE-GIFT and has filed your claim. The bank claims once a year on the scheme portal after you have paid that year's interest, and the first claim after the project is complete needs the sanction letter, tax invoices for the machinery and a geotagged photo of the site.

## What to do now

1. Size the plant from 12 months of electricity bills and your sanctioned load; the bank asks for both.
2. Price it as an ordinary term loan, with no subvention in the numbers.
3. If your mill is in an ADEETIE re-rolling cluster (Mandi Gobindgarh and Ludhiana, Jaipur, Jalna, Raipur), put furnace or rolling upgrades through ADEETIE separately.
4. Before you sign, check the RAMP portal and SIDBI for any extension of MSE-GIFT.

## What Senseible does here

Senseible reads your electricity bills into units used by month, the figure a solar size and a bank's savings estimate start from. It does not lend; banks and scheme offices decide any loan or support.

- [Compare schemes and download a loan file](https://senseible.earth/msme-green-loan-schemes)
- [Rooftop solar loan: what banks ask](https://senseible.earth/answers/rooftop-solar-loan-msme-what-banks-ask)
- [ADEETIE interest rates](https://senseible.earth/answers/adeetie-interest-subvention-rate-msme)
- [MSE-GIFT and MSE-SPICE explained](https://senseible.earth/answers/mse-gift-and-mse-spice-schemes)
- [Rooftop solar payback for a factory](https://senseible.earth/answers/rooftop-solar-payback-for-a-factory)

Sources: [MNRE, Guidelines for PM-Surya Ghar: Muft Bijli Yojana, Central Financial Assistance to Residential Consumers](https://mnre.gov.in/static/uploads/2025/08/f20f6d61628866e66b612810b49abd78.pdf), [Ministry of MSME, MSE-GIFT Scheme Guidelines (May 2024), RAMP portal: eligible projects, subvention terms, 31.3.2026 sanction date](https://ramp.msme.gov.in/ramp/sites/default/files/2026-05/MSE-GIFT-Circular_0.pdf), [BEE, ADEETIE scheme booklet (clusters, technologies, process, FAQs)](https://beeindia.gov.in/WriteReadData/RTF1984/1772790517.pdf), [SIDBI circular and Ministry of MSME guidelines for MSE-SPICE, RAMP portal](https://ramp.msme.gov.in/ramp/sites/default/files/2026-05/MSE-SPICE-english.pdf), [Mongabay India, Financing the green shift remains a hurdle for steel MSMEs, 24 June 2026](https://india.mongabay.com/2026/06/financing-the-green-shift-remains-a-hurdle-for-steel-msmes/)

Last reviewed 2026-11-28. No MSE-GIFT extension notice was on the RAMP portal or SIDBI's scheme page when checked on 28 November 2026. State solar policies are not covered here.