What do Bokaro industrial area MSMEs make and how much energy do they use?

Phases 3 and 4 hold about 150 units: 135 fabrication and engineering works, 10 foundries and 5 flour mills, using about 6,000 toe a year, nearly all electricity. Motors take about 85% of a unit's power. Daily cuts of 2 to 4 hours put diesel generators on top.

Who works here

Where the power goes

What TERI costed

When the steel plant or an OEM asks

A large buyer filling in its value chain figures will ask for kWh by month, generator diesel and output for the same months. Keep the DG log in litres, not just rupees: at Rs 90 a litre the bill hides the quantity. If DVC supplies you, check which grid factor applies before you report.

Cluster and one unit at FY 2025-26 factors (estimate)

Unit counts, energy and savings from TERI's Bokaro Industrial Area profile (2020-21 data) and SAMEEEKSHA's summary. The cluster figure treats all 6,000 toe as grid power, as the summary names electricity as the main source. The 200,000 kWh and 4,000 litre unit is an assumed example.

What Senseible does here

Senseible reads JBVNL or DVC bills and diesel invoices into monthly Scope 1 and 2 lines with CO2, and keeps them as supplier evidence you can send to the steel plant or an OEM.

Sources: SAMEEEKSHA, Bokaro industrial area summary (TERI-SSEF, 2020-21 data), TERI, Bokaro Industrial Area cluster profile (2021).docx), CEA, CO2 Baseline Database for the Indian Power Sector, version 22.0