The Bureau of Energy Efficiency (BEE) report for Jagadhri swaps 150 tonnes of coke a year for 375,000 kilowatt-hours (kWh) in a 750 kg induction furnace. Recounted with today's factors that cuts about 200 tonnes of carbon dioxide (CO2) a year, not the report's 104. Payback is 1.23 years at the report's prices.

What the report sets against what

Per tonne of brass

Coke: 80 kg for 600 kg is 133 kg a tonne. Induction: 250 kWh for 750 kg is 333 kWh a tonne. The 500 kg furnace in BEE's other Jagadhri report needs 350 kWh a tonne, so the larger furnace uses a little less per tonne. It also suits units melting about 2,500 kg a day or more.

Why the CO2 here is higher than the report's 104 t

The report does not show how it got 104 t, and it dates from 2010. With the Intergovernmental Panel on Climate Change (IPCC) 2006 default for coke and the Central Electricity Authority (CEA) grid factor for financial year (FY) 2025-26, the coke avoided exceeds the power added by about 200 t of CO2. Name both factors when you quote the figure.

Checks before you commit

CO2 on the report's own totals

Coke at the IPCC 2006 default (107,000 kg CO2 per terajoule at 28.2 gigajoules per tonne) and grid at CEA's FY 2025-26 factor.

What Senseible does here

Senseible reads your electricity bills into monthly records with CO2 for the power. For coke, apply the factor above to your tonnes. The green loan check shows what a lender asks for on a furnace loan.

Sources: BEE, Detailed project report: induction furnace for brass melting, 750 kg, Jagadhri brass and aluminium cluster (2010, SAMEEEKSHA), IPCC 2006 Guidelines, Volume 2 Energy, Tables 1.2 and 2.3, CEA CO2 Baseline Database, version 22.0

Last reviewed 2026-11-04. Report figures are from a BEE SME programme project report; costs and paybacks are at the report year's prices. Re-check the grid factor when CEA publishes a new edition.