Senseible

What carbon data should a construction contractor include in a tender bid?

Give site emissions from completed projects: diesel at 2.68 kg CO2 per litre and site electricity at 0.710 kg CO2 per kWh, per square metre or per contract value. Back each figure with invoices and fuel logs, and list the steps you will take on the new site.

What to include

What clients check

A figure with dated invoices behind it holds up better than a claim. State the method, the factors and what is excluded, such as materials bought by the client.

Keep it comparable

Use the same boundary on every project, so a client can compare your sites with each other and with other bidders.

Worked example: a past building project (illustrative inputs)

Quantities are illustrative; use fuel invoices and site electricity bills from the project.

What Senseible does here

Senseible reads diesel invoices, fuel slips and site electricity bills into a dated, fingerprinted record per project, so a contractor can hand a client Scope 1 and 2 figures with the document behind each line. Estimates from hours or distance are labelled as estimates.

Sources: GHG Protocol Corporate Standard, IPCC 2006 Guidelines, Volume 2 Energy (fuel defaults), CEA CO2 Baseline Database, version 21.0

Last reviewed 2026-10-21.