We only cut, slit or weld bought steel. Do we still need CBAM verification?

Only if you want your EU buyer to use actual figures instead of defaults. Cutting, welding, plating and finishing emissions are left out of CBAM, but the verifier still checks that you do nothing else, that precursor tonnes are counted before cutting, and where your coil came from. Your monitoring plan can be very short.

Which steps are left out

What the verifier still checks

  1. That the unit really carries out only the excluded steps. The site visit rules still apply.
  2. That precursor mass is taken as it enters, before cutting. All the coil's emissions land on the tonnes you ship, so your figure per tonne rises above the coil's even though cutting adds nothing.
  3. Where each coil or sheet came from: EU material counts as zero, Indian material needs the India default or a valid supplier verification report, and material of unknown origin takes the Annex IV default.
  4. That supplier reports cover the right year and come from a verifier accredited for that sector.

A short monitoring plan is allowed

The Commission's steel and aluminium guidance says the plan can be very concise, because there are no combustion, process or indirect emissions to monitor. The excluded steps need not appear as source streams or in the emissions report. What it must cover: list of goods by CN code, how you weigh coil in and product out, how you link coil numbers to supplier documents, and how you collect supplier reports.

Run the numbers before you hire a verifier

With default values for the coil, your actual figure comes out higher than the default your buyer could use for the finished strip, because the yield loss pushes it up. Verification pays only if your coil supplier gives you a verified figure low enough to beat the default after yield loss. Ask for that report first.

Worked example: slitting 1,000 t of Indian hot-rolled coil (CN 7208) in 2026 into 960 t of strip (CN 7211)

Assumes 4% edge trim and no other precursors. The free allocation adjustment is left out.

What Senseible does here

Senseible's CBAM Suite records coil bought by supplier and CN code, product shipped and scrap, and works out your figure per tonne with defaults or your supplier's verified values, so you can see the break-even before paying for verification. Senseible is not a CBAM verifier.

Sources: European Commission, CBAM Guidance No. 5d, iron and steel (sections 2.2.3.8 and 3.1.1), European Commission, CBAM Guidance No. 5e, aluminium (section 3.1.1), European Commission, Guidance on CBAM verification and accreditation (24 August 2026), section 4.9, footnote 74, European Commission, default values file (version of 6 August 2026), India sheet

Last reviewed 2026-10-29.