What does a soft starter with energy saver save on a dairy ammonia compressor?

Six per cent of the compressor motor's draw, in Bureau of Energy Efficiency (BEE)'s Gujarat dairy reports: 11,520 kWh a year on a 30 kW motor and 25,012 kWh on a 75 kW one. Payback is 2.1 and 1.67 years at 2010 prices. The 30 kW report shows 21.7 kW in its text but sums on 26.7 kW.

Why a compressor motor wastes power

A reciprocating ammonia compressor loads and unloads cylinders as demand moves, so the motor often runs well below full load, down to about 25% at times. BEE's auditors logged this on site. Refrigeration is at least 30% of the energy a dairy cluster plant uses. A soft starter with an energy saver replaces the star-delta starter, lowers the voltage at part load and eases the start, which also cuts the starting current. The reports claim 6%.

The two cases side by side

A slip in the 30 kW report

Its text says the compressor draws 21.7 kW, which is 156,240 kWh a year. Its annexure, which the saving is built on, says 26.7 kW. Six per cent of 26.7 kW is the 11,520 kWh. If your motor draws the lower figure, the saving is smaller, so log your own motor before you accept either. The 75 kW report also counts 2 motors and prices the starter at Rs 2.45 lakh, yet its saving covers one 57.9 kW compressor, so its payback is unclear.

Other changes the report lists

The sums

Report figures at the report's tariffs. The 75 kW sum covers one 57.9 kW compressor.

What Senseible does here

Senseible reads electricity bills into monthly kWh and carbon dioxide equivalent (CO2e) at the grid factor for the bill's financial year, so a saving shows in later bills. A bill covers the whole plant, so a single compressor's saving is small beside it; log the motor's own kW as well.

Sources: BEE, Detailed project reports: soft starter with energy saver for motor 30 kW and 75 kW, Gujarat dairy cluster (2010, SAMEEEKSHA), BEE, Detailed project report: soft starter for motor 75 kW, Gujarat dairy cluster (2010, SAMEEEKSHA), CEA CO2 Baseline Database, version 22.0

Last reviewed 2026-11-04. Report figures are from a BEE SME programme project report; costs and paybacks are at the report year's prices. Check today's prices and a current quote before you rely on the payback. Re-check the grid factor when CEA publishes a new edition.