Senseible

Do I need permanent carbon removals for net zero, or will tree planting do?

For the residual CO2 left at your net zero year, yes: SBTi's Corporate Net-Zero Standard expects durable, long-lived removals to neutralise it. Tree planting stores carbon that fire, pests or felling can release, so it alone will not cover that residual. It still fits before then, as climate action beyond your value chain.

Where removals fit in a net zero target

Net zero is reached by cutting your own Scope 1, 2 and 3 emissions first; under version 1 of the SBTi Corporate Net-Zero Standard that meant at least 90 percent for most sectors. Removals are only for the residual that cannot be cut, and they never count as progress toward your reduction targets. Credits bought before the net zero year sit outside the target, as climate action beyond your value chain.

Durable and nature-based removals compared

What the main guidance says

A decision rule

  1. Size your residual: your base year emissions times the share the standard lets remain at the target year.
  2. Split the residual by gas: plan to cover the long-lived part, mostly CO2, with durable removals at the target year, and budget for it now, since supply is thin.
  3. Use nature-based removals for any short-lived residual and, before the target year, as climate action beyond your value chain, from projects with buffer pools and long monitoring periods.
  4. Never report either kind as a reduction in your inventory.

Illustrative sizing of a residual

The 90 percent cut and the 1,800 t CO2 share are assumptions for illustration; your sector pathway and gas mix set the real figures.

What Senseible does here

Senseible keeps the Scope 1, 2 and 3 inventory that your base year and residual are measured from. Which removals qualify is decided by the standard and confirmed by your target validator or verifier.

Sources: SBTi Corporate Net-Zero Standard, version 2.0 (June 2026), ISO 14068-1:2023, Carbon neutrality (iso.org)

Last reviewed 2026-10-17. SBTi Corporate Net-Zero Standard version 2.0 has a transition period from version 1; re-check its effective dates and removal percentages before setting or resubmitting a target.