Senseible

How do I calculate the carbon footprint of an electricity meter?

Add the circuit board, current sensor, display, relay and plastic case per meter with supplier figures. Add assembly, calibration and testing electricity, then divide by meters passed. Smart meters add a communication module.

Bought-in parts

Assembly

Per meter

Report per meter by type, single or three phase, and with or without a communication module.

Worked example: electricity meter unit per meter (one month)

Inputs are illustrative; use your own bills and production records.

What Senseible does here

Senseible reads the plant's electricity bills (CEA grid factor 0.710 kg CO2 per kWh, CO2 Baseline Database version 21.0) and fuel invoices (IPCC 2006 defaults) into a fingerprinted Scope 1 and 2 record, the plant-level input to a per-unit figure. Bought-in materials go to the supplier evidence trail; product reports are self-declared drafts.

Sources: GHG Protocol Product Standard, ISO 14067:2018, Carbon footprint of products (iso.org), IPCC 2006 Guidelines, Volume 2 Energy (fuel defaults), CEA CO2 Baseline Database, version 21.0

Last reviewed 2026-10-20.