Senseible

How should a factory run its transformer to keep losses and failures down?

Load it close to its best efficiency point, keep the power factor near unity at the transformer, and switch off a lightly loaded unit running in parallel. BEE's MSME guidelines target winding temperature within 100 to 120 °C and oil within 90 °C, with daily logs of voltage, current and temperatures.

Loading

Transformer loading (%) = measured kVA / rated kVA x 100. Run close to the best efficiency point on the maker's data. Where two transformers run in parallel, switch one off at light load and make sure voltage ratio, impedance and polarity match.

What to log

Maintenance

Buying a new transformer

What Senseible does here

Senseible reads HT bills, including kVAh, kWh and power factor where printed, so changes after transformer or power factor work show in the monthly record.

Sources: BEE, Energy Conservation Guidelines for MSME Sector (2019): section 5.6 and Table 5.12

Last reviewed 2026-10-24.