Senseible

What is the energy use and CO2 of the Giridih secondary steel cluster in Jharkhand?

TERI's May 2024 profile puts Giridih's steel units at 1.49 million t of coal and 1,095 million kWh a year, about 0.88 million toe, and 3.93 million t CO2. Sponge iron is half of it: 1.97 million t CO2 from 0.75 million t of DRI.

What the cluster makes

CO2 by unit type

Giridih kilns burn more coal per tonne

1.05 million t of coal for 0.75 million t of DRI is 1.4 t a tonne. TERI's Ballari study puts sponge iron at 1.0 to 1.2 t. Some of the gap is coal quality, so compare heat per tonne using your coal's GCV, but a kiln at 1.4 t has room to save.

What TERI says would help

CO2 per tonne by unit type (from the profile)

From TERI's May 2024 Giridih profile. The cluster average adds stages that feed each other, so use your own unit type.

What Senseible does here

Senseible reads coal invoices and DVC bills into monthly records you can divide by tonnes; it has no built-in coke factor. The CBAM pages show what a DRI or billet figure means for an EU buyer.

Sources: TERI, Cluster profile: Giridih secondary steel cluster (May 2024), TERI, In-depth study: Iron and steel industries in Ballari cluster (2025), CEA, CO2 Baseline Database for the Indian Power Sector (grid factor 0.675 kg CO2 per kWh, FY 2025-26), IPCC 2006 Guidelines, Volume 2 Energy (fuel emission factors)

Last reviewed 2026-10-31.