How many kWh does a new 60 HP refrigeration compressor save in a block ice plant?

Thirteen kWh per tonne of ice, or 52,707 kWh a year at 4,200 t, in BEE's Bhimavaram report: roughly 36 t CO2 on today's grid. Cost Rs 3.52 lakh, payback 1.78 years (2010). If you make more ice with the bigger capacity, total kWh rises, not falls.

The worn compressor BEE measured

What the new compressor promises

Total kWh can go up

The report's 52,707 kWh saving holds only if you keep making 4,200 t. Run the faster compressor to 5,460 t and the plant uses 356,160 kWh, about 29,500 kWh more than before. Your CO2 per tonne falls; your total rises with output. Report both figures so a buyer or lender sees why.

Checks before and after

Same 4,200 t of ice, old and new compressor

Grid factor 0.675 kg CO2 per kWh, CEA FY 2025-26, an estimate. Payback at the report's tariff of Rs 3.75 per kWh.

What Senseible does here

Senseible reads your electricity bills into monthly kWh and CO2 records; divide by tonnes of ice to track kWh per tonne after the change. The green loan check shows what a lender will want for the new compressor.

Sources: BEE, Detailed project report: new refrigeration compressor 60 HP, Bhimavaram ice making cluster (2010, SAMEEEKSHA), CEA, CO2 Baseline Database for the Indian Power Sector, version 22.0 (FY 2025-26 grid factor)

Last reviewed 2026-10-31. Equipment figures are from a BEE SME programme project report; costs and paybacks are at that report's prices. Recheck with today's fuel and power prices and a current quote.