Can I get an IREDA loan for a biomass boiler that sells steam to factories?

Yes, under IREDA's scheme for biomass heating projects, if you hold a valid agreement to supply steam to a buyer or use it yourself. IREDA lends up to 70% of project cost, minimum ₹50 lakh, repaid over up to 8 years after a moratorium of up to 12 months, and funds only one such project within 50 km.

The terms in IREDA's norms updated to 1 October 2026

Check the 50 km rule before you pay for a project report

IREDA finances no more than one biomass heating project for commercial use within a 50 km radius, counting projects funded by IREDA or by other lenders. If another steam supplier near your industrial estate already has a loan, your application can fail on location alone. Ask IREDA this question first.

Your steam contract carries the loan

Conditions that catch first-time borrowers

What persuades a factory to sign

The factory is replacing its own coal or oil boiler. It signs a long contract when your steam is cheaper or steadier, and when it can show its own fuel emissions falling. Its coal invoices give the before figure. After the switch, the CO2 from burning biomass is reported separately as biogenic, while the methane and nitrous oxide still count in its Scope 1.

A ₹8 crore steam plant serving one dyeing unit (assumed figures)

Project cost, coal tonnage and calorific value are assumptions; use the buyer's invoices and coal test certificates for the real figures.

What Senseible does here

Senseible does not lend. It turns the coal and fuel invoices of the factory you plan to supply into monthly tonnes of CO2, a before figure that the buyer and IREDA can both check against the original bills.

Sources: IREDA, Financing Norms and Schemes, Issue 35, updated to 1 October 2026: section 3 (eligible entities) and section 12 (XXII), Scheme for Financing of Biomass projects for heating applications for commercial use, IPCC, 2006 Guidelines for National Greenhouse Gas Inventories, Volume 2 Energy: default CO2 factor for other bituminous coal, 94,600 kg per TJ, GHG Protocol Corporate Standard: biogenic CO2 from biomass combustion reported separately from the scopes

Last reviewed 2026-10-30. IREDA reissues its Financing Norms and Schemes; re-check section 12 (XXII) when a new issue appears.