What short-term or project-specific loans does the Indian Renewable Energy Development Agency (IREDA) give renewable energy contractors and equipment suppliers?

IREDA gives suppliers, contractors and manufacturers a short-term loan, repaid within 1 year of first disbursement, and a project specific funding (PSF) loan tied to one supply contract, generally repaid within 3 years. Both ask the applicant to confirm land, permit or grid connectivity. The PSF loan also needs a no-objection certificate (NOC) from working capital lenders.

The two loans side by side

How PSF repayment is capped

The terminal date for repaying a PSF loan is kept within the scheduled commercial operation date (SCOD) under the power purchase agreement (PPA) plus a maximum of 6 months. If the SCOD is extended later with the approval of the agency concerned, the terminal date may shift at IREDA's discretion, provided that was an original sanction condition. The loan amount is assessed from the cash flow of the specific contract.

Security

Reporting and monitoring

What is on hold

IREDA's Guarantee Assistance Scheme for suppliers, manufacturers, EPC contractors and developers, which covers bid security, performance guarantees and advance payment guarantees, was put on hold under a board approval of 25 March 2026 and is reviewed periodically. It needs a track record of at least 50 megawatts (MW) of renewable projects in India. My reading: that makes it a scheme for large contractors, not small installers.

Example: the PSF terminal date

The dates are examples. The document says repayment is generally within 3 years and the terminal date within the SCOD plus 6 months; the SCOD cap is the stated limit and the 3 years is a general rule.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records. It does not lend, and it does not prepare contract cash flow statements.

Sources: IREDA, Financing Norms and Schemes, issue 35, updated up to 01.10.2026: short term loan assistance to suppliers and contractors; Project Specific Funding loans; Guarantee Assistance Scheme (on hold)

Last reviewed 2026-11-05. Terms are reissued with each issue of the norms. Check the current issue and ask IREDA whether a given applicant category is eligible.