Senseible

How do the Bureau of Energy Efficiency Jamnagar gas rotary furnace reports for 250, 500 and 750 kg a batch differ?

The three Bureau of Energy Efficiency (BEE) Jamnagar reports use 56.25 normal cubic metres (Nm3) of gas in place of 192.16 kilograms of coal per tonne of brass. What differs is the batch: 250, 500 and 750 kilograms (kg) give 333, 667 and 1,000 tonnes a year, and payback of 1.27, 1.32 and 0.99 years.

The three reports side by side

What every report shares

Why 750 kg pays back fastest

The tonnes come from the batch: 250 kg every 1.5 hours is about 167 kg an hour, and over 2,000 hours that is 333 tonnes. At 500 kg it is 667 and at 750 kg, 1,000 (my reading of the printed sums). Each tonne saves the same Rs 2,109, so saving per furnace grows with batch size faster than price does: 750 kg costs Rs 2.20 lakh more than 500 kg but is assumed to melt 333 tonnes more. The 750 kg report's cash-flow sheet labels its capacity 750 kg an hour, while its title and its 1,000 tonnes say 750 kg a batch.

Carbon dioxide (CO2): the printed cuts are too high

750 kg a batch, one year

Prices are the reports' own at 2010. Coal factor is our estimate; the gas figure is the report's own.

What Senseible does here

Senseible reads coal invoices, gas bills and electricity bills into monthly records, so coal or gas per tonne of brass before and after a furnace change is on file. It does not size furnaces or confirm a vendor's efficiency figure.

Sources: BEE, Detailed project report: energy efficient gas fired rotoberatory furnace, 250 kg, Jamnagar brass cluster (2010, SAMEEEKSHA), BEE, Detailed project report: energy efficient gas fired rotoberatory furnace, 500 kg a batch, Jamnagar brass cluster (2010, SAMEEEKSHA), BEE, Detailed project report: energy efficient gas fired rotoberatory furnace, 750 kg a batch, Jamnagar brass cluster (2010, SAMEEEKSHA), Central Electricity Authority (CEA), CO2 Baseline Database, version 22.0

Last reviewed 2026-11-06. Report figures are from BEE's Small and Medium Enterprises (SME) programme project reports; costs, fuel prices and paybacks are at 2010 prices. Redo the payback with today's coal and gas prices and a current quote.