Senseible

Our clinic or office is in a building where the landlord runs a central boiler and rooftop solar and we pay one lump rent: do we report that heat and power?

Yes, under operational control. The Greenhouse Gas Protocol Scope 2 Guidance says an on-site boiler typically falls under the landlord's operational control, so tenants would report it as Scope 2, and the consumer of energy sold from on-site generation reports it in Scope 2 too. A lump rent with no separate bill does not remove it.

What the Scope 2 Guidance says

Who reports what in your building

Getting a number when there is no bill

The guidance says that where consumption occurs in a shared space without metering, estimates may be used, and gives the Area Method for electricity: allocate the whole building's electricity "on the basis of the reporter's square footage and the building's occupancy rate". The same area and occupancy split for boiler fuel is our extension, not a rule in the guidance. Label it an estimate and replace it when the landlord gives you metered heat.

Diagnostic centre on two floors (example figures)

The area and occupancy split applied to boiler fuel is our extension of the guidance's electricity method. Use the fuel and factor your landlord actually runs.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records. Upload your own electricity bills for the space you rent. Heat from a landlord's boiler has no bill of yours to read, so Senseible cannot fill that line without figures from the landlord.

Sources: GHG Protocol Scope 2 Guidance, sections 5.2.1 and 5.4, endnote 2 of Chapter 5, and section 6 on estimating shared space

Last reviewed 2026-11-06. Quotes are from the Scope 2 Guidance. The area split for boiler fuel is our extension. Re-check if the Scope 2 Guidance is revised.