Senseible

How do I calculate the carbon footprint of paint per litre?

Add the titanium dioxide, binder, extenders, solvents, additives and containers from supplier or database factors, then your mixing and dispersion electricity and any boiler or generator fuel. Divide by litres filled. Pigment and binder usually outweigh plant energy by a wide margin.

Raw materials, by weight in the recipe

Plant energy

Per litre of what

Report per litre of paint as filled. A litre of a high-solids enamel and a litre of a distemper differ several times over, so give each product family its own figure rather than one plant average. Allocate plant electricity by litres or by batch hours if you meter mills separately.

Solvent emissions

Solvent that evaporates is a VOC, not CO2, unless it is burnt in a thermal oxidiser. If you run an oxidiser, count the CO2 from its fuel and from the solvent it burns as Scope 1.

Worked example: paint plant per litre (one month)

Inputs are illustrative; use your own bills and production records.

What Senseible does here

Senseible reads the plant's electricity bills (CEA grid factor 0.710 kg CO2 per kWh, CO2 Baseline Database version 21.0) and fuel invoices (IPCC 2006 defaults) into a fingerprinted Scope 1 and 2 record, the plant-level input to a per-unit figure. Bought-in materials go to the supplier evidence trail; product reports are self-declared drafts.

Sources: GHG Protocol Product Standard, ISO 14067:2018, Carbon footprint of products (iso.org), IPCC 2006 Guidelines, Volume 2 Energy (fuel defaults), CEA CO2 Baseline Database, version 21.0

Last reviewed 2026-10-20.