Can one PPA cover our plants in different Indian states under SBTi V2?

Possibly. SBTi Corporate Net-Zero Standard V2.0, C30.3b, lets one PPA with a low-carbon project in any of your interconnected activity pools on one wide-area synchronous grid cover your combined load, if offtake starts within 36 months of the project's commissioning and market-instrument rules allow it.

The conditions in C30.3b

  1. Your operations sit in two or more interconnected activity pools within one wide-area synchronous grid.
  2. The project is located in one of those pools, not elsewhere.
  3. The PPA covers the combined load of those operations.
  4. Offtake begins within 36 months of the project's commissioning.
  5. You stay within the regulatory limits on market instruments.

The open question for India

An activity pool is drawn on deliverability regions. Footnote 47 says SBTi will revisit deliverability definitions after the GHG Protocol finishes its revision, so how India's grid is divided is not settled. Whether each state, each region or the whole country is one pool will decide whether you even need this clause.

Other routes

Example: three plants, one PPA

Example company.

What Senseible does here

Senseible reads each plant's electricity bills, so state-by-state consumption is ready for a load-weighted split. Market-based Scope 2 needs the PPA's generation and attribute data. It does not set, validate or assure SBTi targets.

Sources: SBTi, Corporate Net-Zero Standard V2.0, Criteria (final, released June 2026, effective 1 February 2027): C30, C31.3 and footnote 47