Should a seafood plant swap to screw compressors or to an ammonia and carbon dioxide system?

The Energy and Resources Institute (TERI) seafood profiles put screw compressors at 10 to 20% less specific power than reciprocating ones, for about rupees (Rs) 2.0 to 2.5 million and a 1.5 to 2 year payback. A full ammonia and carbon dioxide system saves about 35% but costs Rs 30 to 40 million, payback 5 to 6 years.

The two options as TERI states them

What the profiles do not say

They do not state which energy the percentages apply to, or how big the "typical facility" is. Our reading is that they apply to refrigeration power. The Veraval profile puts refrigeration drives at about 80% of a plant's electricity. Check the base before you quote a percentage to a lender.

Which to pick first

The 3,000 tonne a year Veraval plant, financial year (FY) 2025-26 grid factor (example)

The 80% base is our reading, as set out above. Plant electricity is from the profile; the percentages are TERI's. Measure your own compressor load before you decide.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so a plant can see its yearly electricity and the month-by-month change after an upgrade. It does not size compressors or confirm the saving a supplier promises.

Sources: Cluster profile of Veraval seafood processing industries, The Energy and Resources Institute (option v), Cluster profile of Odisha (Bhubaneswar) seafood processing industries, The Energy and Resources Institute (option v), Central Electricity Authority (CEA), CO2 Baseline Database for the Indian Power Sector, version 22.0 (0.675 kg CO2 per kWh, FY 2025-26)

Last reviewed 2026-11-06. Costs are in the profiles' own rupee figures from 2015 to 2017. Get a current quote.