Senseible

What is the typical kWh and coal per tonne for DRI, induction furnace, re-rolling and ferro alloy units?

TERI's 2025 Ballari study: sponge iron takes 1,000 to 1,200 kg of coal and 70 to 80 kWh a tonne, an induction furnace with continuous casting 850 to 950 kWh, rolling 80 to 120 kWh plus 90 to 120 kg of coal to reheat, and ferro manganese 3,500 to 4,500 kWh with 450 to 550 kg of coke.

The ranges, per tonne of product

Before you compare, check the coal

The study assumes coal at 5,000 kcal per kg and coke at 7,500. If your coal is 4,200 kcal, you will burn more kilograms per tonne with no worse a kiln. Compare heat per tonne, not just kilograms, using the GCV on your coal test reports.

Turning a range into CO2

  1. Coal: kg x 1.76 for Indian coal or 2.44 for imported.
  2. Coke: kg x about 3.0, the IPCC default for coke, unless your supplier gives a tested figure.
  3. Electricity: kWh x 0.675.
  4. Add the stages your metal actually went through, in the proportion you used them.

What CBAM sees

For iron and steel goods CBAM counts direct emissions only. A DRI tonne's coal counts in full; an induction furnace's electricity drops out. That is why an induction-route billet can look light on a CBAM form and heavy in a buyer's footprint.

CO2 per tonne at the middle of each range (estimate)

Ranges from TERI's 2025 Ballari study; factors India BUR-2 coal, IPCC 2006 coke and CEA FY 2025-26. Your own logs replace every number here.

What Senseible does here

Senseible reads coal invoices and power bills into monthly records you can divide by tonnes made; it has no built-in coke factor. The CBAM pages show the direct-emissions view.

Sources: TERI, In-depth study: Iron and steel industries in Ballari cluster (2025), Regulation (EU) 2023/956 (CBAM), consolidated text, CEA, CO2 Baseline Database for the Indian Power Sector (grid factor 0.675 kg CO2 per kWh, FY 2025-26), IPCC 2006 Guidelines, Volume 2 Energy (fuel emission factors)

Last reviewed 2026-10-31.