Senseible

How much electricity and CO2 does weaving one metre of fabric take on water-jet, air-jet and rapier looms?

There is no single figure: it depends on loom type, speed, pick density and width, so measure it. Divide a month's weaving kWh by metres woven, then multiply by 0.710 kg CO2 per kWh. Sub-meter each loom group, and the compressor for air-jets, to compare loom types fairly.

Why loom type changes the number

How to measure it

  1. Fit a sub-meter on each loom group, or at least on the compressor, and read it on the same day as the main meter.
  2. Take metres woven per loom group for the same month from loom counters or the production register.
  3. Divide shared loads by metres woven or by loom running hours, and say which.
  4. Add diesel used by the DG set during power cuts: litres x 2.68 kg CO2 per litre.
  5. kWh per metre = group kWh / metres woven; CO2 per metre = kWh per metre x 0.710.

Compare like with like

A dense, wide quality takes more picks per metre, so it takes more electricity per metre on any loom. Before comparing loom types, or your shed with another, compare the same quality, or express the figure per million picks: kWh / (metres woven x picks per metre / 1,000,000). That removes most of the difference that comes from the fabric rather than the loom.

Where the figure goes next

The weaving figure is grey fabric only. A product footprint adds the yarn, sizing, and processing in the dye house, and a buyer comparing suppliers will ask which of these you included.

Illustrative sub-meter month: one shed, two loom groups

Readings are illustrative, not benchmarks, and the two groups weave different qualities. Use your own sub-meter data before drawing any conclusion about loom type.

What Senseible does here

Senseible turns the weaving shed's electricity bills into location-based Scope 2 at 0.710 kg CO2 per kWh, and DG diesel invoices into Scope 1. Metres woven and sub-meter splits come from your own records.

Sources: CEA CO2 Baseline Database, version 21.0, GHG Protocol Scope 2 Guidance

Last reviewed 2026-10-18.