CBAM cost per tonne of cement, 2026 to 2034

Using EU default values and a certificate price of €82.32, CBAM adds about €76.94 per tonne of cement imported from India in 2026 on the Grey Clinker (Dry Process) route, rising to €125.87 in 2030 and €154.1 in 2034 as free allocation ends.

Cost per tonne by year (€)

Route202620272028202920302031203220332034
Grey Clinker (Dry Process) (1.44 tCO2/t default)7790105112126133140146154
White Clinker (1.41 tCO2/t default)59728796114123132141151
Blended Cement (PPC) (1.48 tCO2/t default)8194109116130137144151158

Assumptions: EU default values with the default-value mark-up, certificate price held at €82.32 (Q3 2026), origin India with no carbon price paid at origin. Estimates, not a CBAM declaration.

Covered CN codes

Questions

What is the CBAM cost per tonne of cement in 2026?

About €76.94 per tonne at default values on the Grey Clinker (Dry Process) route (1.44 tCO2 per tonne plus the default-value mark-up), with 98% of the EU benchmark still allocated free.

How much does the production route change the CBAM cost?

By 2034 the default-value cost ranges from €150.89 per tonne on the White Clinker route to €158.38 per tonne for the most carbon-intensive route listed.

How can an exporter lower this cost?

Replace default values with verified actual emissions from the installation: CBAM charges on the embedded emissions declared, and for this sector default values carry a 30% mark-up from 2028.