CBAM cost per tonne of cement, 2026 to 2034
Using EU default values and a certificate price of €82.32, CBAM adds about €76.94 per tonne of cement imported from India in 2026 on the Grey Clinker (Dry Process) route, rising to €125.87 in 2030 and €154.1 in 2034 as free allocation ends.
Cost per tonne by year (€)
| Route | 2026 | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 |
|---|---|---|---|---|---|---|---|---|---|
| Grey Clinker (Dry Process) (1.44 tCO2/t default) | 77 | 90 | 105 | 112 | 126 | 133 | 140 | 146 | 154 |
| White Clinker (1.41 tCO2/t default) | 59 | 72 | 87 | 96 | 114 | 123 | 132 | 141 | 151 |
| Blended Cement (PPC) (1.48 tCO2/t default) | 81 | 94 | 109 | 116 | 130 | 137 | 144 | 151 | 158 |
Assumptions: EU default values with the default-value mark-up, certificate price held at €82.32 (Q3 2026), origin India with no carbon price paid at origin. Estimates, not a CBAM declaration.
Covered CN codes
- 2523: Portland cement
- 252310: Cement clinkers
- 252329: Other Portland cement
- 252390: Other hydraulic cements
Questions
What is the CBAM cost per tonne of cement in 2026?
About €76.94 per tonne at default values on the Grey Clinker (Dry Process) route (1.44 tCO2 per tonne plus the default-value mark-up), with 98% of the EU benchmark still allocated free.
How much does the production route change the CBAM cost?
By 2034 the default-value cost ranges from €150.89 per tonne on the White Clinker route to €158.38 per tonne for the most carbon-intensive route listed.
How can an exporter lower this cost?
Replace default values with verified actual emissions from the installation: CBAM charges on the embedded emissions declared, and for this sector default values carry a 30% mark-up from 2028.