CBAM Compliance Cost for Steel Manufacturing in India
Since 1 January 2026, EU buyers of Indian steel owe CBAM certificates on every tonne of embedded emissions above the free-allocation adjustment. Coal-based routes sit well above EU benchmarks, so verified intensity data now decides your landed price.
Steps
- Map CBAM-Covered Products: Identify which steel exports from India fall under EU CBAM CN codes.
- Calculate Embedded Emissions: Use Senseible to compute Scope 1 + 2 emissions per tonne of steel product using country-specific grid factors.
- Prepare CBAM Declaration: Generate quarterly CBAM reports with verified emission intensity data and methodology documentation.
- Estimate Financial Exposure: Use the CBAM Calculator to project costs from 2026 to 2034 based on phase-in schedule and EU ETS prices.
- Reduce and Offset: Implement reduction strategies and explore carbon credit monetization to lower net CBAM liability.
At a glance
| Item | Value |
|---|---|
| Intensity assumed (Blast Furnace (BF-BOF)) | 4.28 tCO2 per tonne |
| Estimated CBAM cost, 2026, 1,000 t, verified data | €242,371 |
| Same shipment, default value with 10% mark-up | €277,604 |
| Estimated cost, 2030 (verified data) | €294,249 |
| Estimated cost, 2034 (no free allocation) | €352,330 |
| Certificate price used | €82.32 (Q3 2026, European Commission) |
Questions
Who pays CBAM, the exporter or the EU buyer?
The EU importer, as an authorised CBAM declarant, buys and surrenders certificates; the first annual declaration for 2026 imports is due by 30 September 2027. The exporter supplies verified emissions data per tonne so the importer does not have to use default values with a mark-up.
Why does verified data matter so much?
Without it the importer uses the EU default value plus a mark-up of 10% in 2026, 20% in 2027 and 30% from 2028 (Implementing Regulation (EU) 2025/2621). In this example that adds about €35 per tonne in 2026.
Which India grid factor applies?
For steel, CBAM counts direct emissions only. For your own Scope 2, the Central Electricity Authority CO2 Baseline Database v22.0 gives 0.675 tCO2 per MWh for FY 2025-26.
Related
- Free tool
- Industry guide
- CBAM for Indian Exporters: What Changed on 1 January 2026
- CBAM Compliance for Steel & Metal in Bangladesh
- Scope 3 Calculator for Steel Manufacturing in India
- CBAM Compliance for Chemical Industry in India