What does a new 11 kW seed cracker motor save over a rewound one in a mustard oil mill?

In a Bureau of Energy Efficiency (BEE) report for Alwar, an 11 kilowatt (kW) mustard seed cracker motor at 80% efficiency is replaced by one at about 92%: 1.4 kilowatts less, about 7,140 kilowatt hours (kWh) a year, Rs 0.35 lakh, for Rs 0.55 lakh. Payback is 1.6 years.

What the seed cracker does

Mustard seed goes through the cracker first, where it is broken into fine pieces, before the kolhu and the expeller. The report says the cracker usually runs on standard, old or rewound motors, which is where the saving sits.

The sum

Read the carbon dioxide line with care

The report's carbon dioxide (CO2) saving is 6.48 tonnes, which is 0.90 kg a kWh. At the Central Electricity Authority (CEA) factor for financial year (FY) 2025-26, 0.675, the same 7,140 kWh is 4.8 tonnes.

Motor saving, step by step (estimate)

Report figures from the Bureau of Energy Efficiency (BEE) Alwar oil mill project report. The summary prints 0.92.2, the text says 92.2%, and its 1.4 kW matches 0.92.

What Senseible does here

Senseible reads electricity bills into monthly kilowatt hours (kWh), so a new motor shows up as a drop against the same months a year earlier. A single motor is not metered on its own bill. The green loan check shows what a lender asks for.

Sources: BEE, Detailed project report: energy efficient seed cracker motor, Alwar oil mill cluster (SAMEEEKSHA), CEA, CO2 Baseline Database for the Indian Power Sector

Last reviewed 2026-11-04. Report figures are from a Bureau of Energy Efficiency (BEE) Small and Medium Enterprises (SME) programme project report; costs and paybacks are at the report year's prices. Check today's prices and a current quote before you rely on the payback.