What does BRSR ask about water drawn in water-stressed areas?

For each plant in an area of water stress, Principle 6 leadership indicator 1 asks the area's name, what the plant does, and its water withdrawal by source, consumption, intensity and discharge by destination and treatment, in kilolitres. SEBI's guidance counts groundwater blocks rated over-exploited or critical as water-stressed.

First, which plants are in

SEBI's guidance note defines areas of water stress as places that cannot meet human and ecological demand for water, whether through availability, quality or access. Any area the Central Ground Water Board rates over-exploited or critical counts, so look up each plant's block in the latest CGWB groundwater assessment. The test is where the plant stands, not where its water comes from: a plant on municipal supply in a critical block still gets a row.

What each plant's row needs

Where the kilolitres come from

  1. Borewell flow meter readings. Without a meter, pump running hours times rated flow, marked as an estimate.
  2. Water bills from the municipality or industrial area, and tanker invoices: both are third party water.
  3. ETP outlet meter and the returns filed with the pollution control board, for discharge.
  4. Consumption is withdrawal minus discharge, so it falls out of the first three.

The turnover question

The format asks for intensity per rupee of turnover for each plant but does not say whose turnover to use when a plant has no separate revenue. State the basis next to the figure, such as the plant's share of sales, and keep it the same every year.

Example: one plant in an over-exploited block

All figures invented to show the arithmetic.

What Senseible does here

Senseible reads electricity bills and fuel invoices into dated records for each site and prepares BRSR drafts from them, with the source on every line. The water rows for each stressed plant come from your meters and bills. Reports are self-declared drafts.