How much of Durgapur's secondary steel energy goes into DRI, and what does CBAM ask of those units?

Over 77%. TERI's 2023 study puts the belt's secondary steel units, around 100 of them, at 2.18 Mtoe a year, of which DRI kilns use 1.68 Mtoe and emit 5.82 of the cluster's 9.66 Mt CO2. For CBAM, sponge iron counts direct emissions only: kiln coal by mass balance, not the power bill.

The belt, industry by industry

Why power matters less for CBAM than for the cluster total

Electricity is 18% of the belt's energy, and the melt shops, which run entirely on it, account for 1.80 Mt CO2 on their own. CBAM leaves electricity out for iron and steel goods. A billet's CBAM figure is built mainly from the sponge iron and other inputs charged into the furnace, at their own figures, so a melt shop's EU buyers end up depending on the DRI kiln upstream. Buyers' product footprints and BRSR requests, on the other hand, count the power in full.

What a DRI unit needs ready for CBAM

  1. Coal in, by weighbridge, with lab carbon content for each lot or a sampling plan.
  2. Iron ore lumps or pellets in. Pellets are a precursor with their own figure.
  3. Char or dolochar out, weighed, with its carbon content.
  4. Sponge iron out, weighed, with its carbon content.
  5. A verifier accredited for activity group V when your EU buyers ask for verified figures.

The savings TERI found

Worked example: one month's mass balance at a 100 tpd kiln

Example tonnages and carbon contents; use your own weighbridge records and lab results. Dolochar later burnt in a boiler is counted as fuel where it is burnt.

What Senseible does here

Senseible's CBAM Suite calculates the kiln's mass balance from your coal, ore, char and sponge iron quantities and their lab carbon contents, and Senseible's in-house review traces a sample of inputs to their weighbridge slips and invoices before your verifier sees them.

Sources: SAMEEEKSHA newsletter, December 2023, Profile of Durgapur secondary steel cluster (TERI), European Commission, Guidance on CBAM verification and accreditation (24 August 2026), sections 2.1, 2.2 and 9.2.3, Table 11

Last reviewed 2026-10-30. TERI's study dates from 2023. Recheck if the full Durgapur cluster report is published.