Which Bureau of Energy Efficiency Godavari heat recovery report pays back fastest for a refractory unit: 50, 100 or 200 tonnes a batch?

In three Bureau of Energy Efficiency (BEE) Godavari reports, kiln heat recovery costs rupees (Rs) 9, 15 and 25 lakh and pays back in 0.57, 0.45 and 0.44 years. All three price coal at Rs 4,500 a tonne. The 50 tonne report prints its carbon dioxide (CO2) twice, 379 and 650 tonnes.

The three reports side by side

Why the 200 tonne report saves a bigger share

The savings are 27.5%, 27.5% and 31.0% of the coal burned. The 200 tonne report uses a hotter flue, 690 against 650 °C, and the annexure uses 35% excess air against 30%, although section 1.4.1 of the same report prints 30%. That gives about 1,538, 1,538 and 1,737 kcal of waste heat above 210 °C for each kilogram of coal burned. At 75% recovery and 4,200 kcal a kilogram, that is 27.5%, 27.5% and 31.0%.

The 50 tonne report disagrees with itself on coal

Other places the reports disagree with themselves

Carbon dioxide: the lines to leave alone

The summary tables print 379, 807 and 1,354 tonnes of CO2 a year. The 50 tonne text (section 3.4.2) says 650 tonnes for the same 370.67 tonnes of coal, 1.75 for each tonne, against the 379 of its summary. On Senseible's Indian coal factor of 1.76 kilograms of CO2 for each kilogram (India BUR-2, 2018), 370.67 tonnes of coal is 652 tonnes, close to 650 and far from 379. The report prints no factor that I could find for 379, so do not copy that line. The 100 and 200 tonne lines are checked on their own pages, linked below. Use your own coal tonnes with a sourced factor.

The 50 tonne annexure arithmetic

Every input is the report's own: 8.50 kilograms of theoretical air, 30% excess air, 0.29 specific heat.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so once you upload your coal and power bills, coal bought each month sits on record to test a report's per batch baseline against. In the self-serve product it does not read kiln logs, so batch counts come from your own firing book; custom integrations are available on request.

Sources: BEE, Detailed project report: waste heat recovery for preheating refractories, up to 50 tonnes a batch, Godavari refractories cluster (SAMEEEKSHA), BEE, Detailed project report: waste heat recovery, 100 tonne kiln, Godavari refractories cluster (SAMEEEKSHA), BEE, Detailed project report: waste heat recovery, 200 tonne kiln, Godavari refractories cluster (SAMEEEKSHA)

Last reviewed 2026-11-06. Figures are from the Bureau of Energy Efficiency (BEE) Small and Medium Enterprises (SME) programme reports, at the report year's prices, coal at Rs 4,500 a tonne. Check today's coal price and a current quote before relying on any payback. Where a report disagrees with itself this page says so.