Which of the Bureau of Energy Efficiency Morbi ceramic reports pays back fastest, and which saves the most rupees?

In the Bureau of Energy Efficiency (BEE) Morbi ceramic reports, leaving out cogeneration, an agitator on and off timer pays back in 0.05 years and roller kiln heat recovery in 0.80. The largest yearly saving, rupees (Rs) 36.10 lakh, is the briquette hot air generator at 1.47. Efficient agitator motors are slowest at 3.4.

Twelve projects, fastest payback first

Each line gives project cost, yearly saving, both in Rs lakh, and payback in years, as the report's own summary table prints them.

Gas, power, or neither

Five reports save gas and pay back in 0.80, 1.00, 1.47, 1.85 and 2.92 years. Six save power and pay back in 0.05, 1.26, 1.82, 1.87, 2.33 and 3.4 years. The power factor panel saves neither fuel nor units, only a rebate on the bill. The three kiln reports we checked price gas at Rs 15 a standard cubic metre (scm), which is a 2010 figure.

Where a report disagrees with its own workings

Files in the public report list that repeat

The list shows 15 Morbi files. Three pairs are word for word the same: the two hot air generator files, the two polishing files, and the two agitation files. The cogeneration reports are left out of the table, as they cost Rs 899 lakh and 1,904 lakh and have their own page.

Yearly saving for each rupee spent, from the printed figures

Figures are the reports' own, at 2010 prices.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so a unit's gas and power bills are on file to test any of these savings against its own use.

Sources: BEE, Detailed project report: briquette fired hot air generator, Morbi ceramic cluster (SAMEEEKSHA), BEE, Detailed project report: energy conservation in polishing section, Morbi ceramic cluster (SAMEEEKSHA), BEE, Detailed project report: use of low thermal mass car in tunnel kiln, Morbi ceramic cluster (SAMEEEKSHA), BEE, Detailed project report: waste heat recovery in roller kiln, Morbi ceramic cluster (SAMEEEKSHA), BEE, Detailed project report: kiln insulation improvement, Morbi ceramic cluster (SAMEEEKSHA)

Last reviewed 2026-11-04. Figures are from BEE's Small and Medium Enterprises (SME) programme project reports; costs, tariffs and paybacks are at the report year's prices. Check today's gas and power prices and a current quote before you rely on any payback.