Is an oversized DG set wasting diesel, and how do I check its loading?

Often, yes. A diesel generator at a low share of its rating makes fewer kWh per litre than it does nearer its rating. To check, divide the kWh it generated by run hours times its kW rating. If the average is low, compare its kWh per litre with the maker's curve and consider a smaller set.

Work out the average load

  1. Read kWh generated and run hours from the DG's energy meter and hour meter for a month.
  2. Convert the rating to kW: kVA x 0.8 for most sets rated at 0.8 power factor.
  3. Average load % = kWh / (run hours x rated kW) x 100.
  4. Divide kWh by litres issued to the DG in the same month to get kWh per litre.

Why low load costs diesel

An engine has fixed losses, friction, cooling and auxiliaries, that do not fall with load. At a quarter load those losses are spread over few kWh, so fuel per kWh rises. Manufacturer fuel curves at 25, 50, 75 and 100 percent load show this for your model. Long running at very low load also causes wet stacking: unburnt fuel and soot build up in the exhaust, which raises maintenance and lowers efficiency further.

Options when the set is too big

Check peak demand before downsizing. A set that trips when the press motor starts saves no diesel.

What this does not tell you

Average load hides peaks. A set averaging 25 percent may still hit 90 percent for a few minutes each hour. Log demand at short intervals for a week before deciding on a size.

Illustrative 250 kVA set in a small plant

The 3.3 kWh per litre is assumed for illustration; read your own maker's curve, and confirm the smaller set covers peak and motor starting loads.

What Senseible does here

Senseible calculates DG CO2 from your diesel invoices at 2.68 kg CO2 per litre and keeps each month's litres in one record, so a right-sizing change shows up as fewer litres for the same outage hours.

Sources: BEE Guide Book 3, Energy Efficiency in Electrical Utilities, Chapter 9 Diesel Generating System, 2006 IPCC Guidelines, Volume 2: Energy