What carbon data do foreign buyers ask Peenya precision component exporters for?
Expect Scope 1 and 2 totals with the 0.710 kg CO2 per kWh CEA factor, the share of green power and a figure per part, mostly material plus allocated machining energy. Check whether your parts fall under CBAM: steel fasteners and some steel articles do, machined assemblies of other metals usually do not.
Typical requests
- Annual Scope 1 and 2.
- Footprint per part or per kg.
- Green tariff or rooftop solar share.
Allocating plant energy
Machine hours per part are often fairer than weight for precision work. State the method.
Karnataka power
A BESCOM green tariff lowers the market based figure; the location based figure stays at the national factor.
What Senseible does here
Senseible reads fuel, electricity and freight invoices into a dated, fingerprinted record per site, so each figure you send a buyer traces back to the documents behind it.
Sources: GHG Protocol Corporate Standard, CEA CO2 Baseline Database for the Indian Power Sector, Regulation (EU) 2023/956 (CBAM Regulation), consolidated
Last reviewed 2026-10-21.