What proof does an export buyer accept that my RECs were retired for my factory?

Send the registry's redemption or retirement statement, not a broker's certificate. It must name your company and factory as beneficiary, list the certificate IDs and MWh, show the generation period, and match your consumption period. Add the electricity bills it covers and a one-page reconciliation of MWh retired against kWh used.

The fields the redemption statement must show

Why a broker's PDF is not enough

The GHG Protocol Scope 2 Guidance accepts a certificate only if it is a unique claim and is retired by or on behalf of the reporting company. Only the registry record shows both. A seller's letter or a certificate image can be copied or reused.

Ask the trader to redeem in your name, then download the statement yourself from the registry account, or ask for the registry's own statement with a reference the buyer can look up. For India RECs the registry is run by Grid Controller of India (Grid-India); I-RECs are redeemed in the I-REC registry, which issues a redemption statement naming the beneficiary.

The reconciliation page buyers ask for

  1. List each site's kWh by month from the electricity bills for the reporting year.
  2. List each redemption: statement reference, MWh, generation period, beneficiary site.
  3. Match them: MWh redeemed per site against MWh used per site in the same year. Most buyers will not let surplus at one site cover another unless the statement names both.
  4. Report location-based Scope 2 on all kWh, and market-based Scope 2 with the covered MWh at zero and the rest at your residual or grid figure, stating which.

Where evidence packs get rejected

Worked example: one factory, one year

If the buyer's method asks for a residual mix factor for the uncovered part, use theirs and say so.

What Senseible does here

Senseible reads the kWh from each electricity bill for location-based Scope 2 and reports a market-based figure when you add the certificate quantity and period, keeping the redemption statement with the bills. It does not buy, redeem or check certificates in any registry.

Sources: GHG Protocol Scope 2 Guidance, Scope 2 Quality Criteria, CERC (Terms and Conditions for Renewable Energy Certificates) Regulations, 2022; India REC mechanism policy (Ministry of Power)

Last reviewed 2026-10-18. Registry operators and statement formats change; check the current India REC registry run by Grid-India and the current I-REC registry statement fields before sending the pack.