How much power does an improved paddy cleaner save in a small rice mill?

In BEE's Ganjam report, a new 1 TPH paddy cleaner on a 0.75 kW motor replaces an old one drawing 2.2 kW, saving 4,959 kWh a year, about 3.3 t CO2. Cost Rs 0.55 lakh, saving Rs 0.21 lakh, payback about 2.6 years. In mills whose old cleaner draws less, the payback stretches to 5 or 6 years.

How much of the mill's bill the cleaner takes

The report's example mill processes 3,420 t a year at 1 tonne an hour, 12 hours a day for 285 days, using about 37 MWh, 11.56 kWh a tonne. Its old 3 HP paddy cleaner draws 2.2 kW: 7,524 kWh a year, about a fifth of the mill's power for one machine. About half the cluster's mills run cleaners this old.

Old against new

Your old cleaner decides the payback

The example mill, one year

CO2 at CEA's FY 2025-26 grid factor of 0.675 kg per kWh. Paybacks at the report's Rs 4.20 a kWh.

What Senseible does here

Senseible's calculators turn kWh into CO2 on the current grid factor. For a rice mill on grid power alone, the monthly electricity bill is nearly the whole footprint, and Senseible reads those bills into records.

Sources: BEE, Detailed project report: new improved design paddy cleaner (1.0 TPH), Ganjam rice mill cluster (SAMEEEKSHA), CEA CO2 Baseline Database, version 22.0

Last reviewed 2026-11-01. Report figures are from a BEE SME programme project report; costs and paybacks are at the report year's prices. Check today's tariff and a current quote.