C14 says the minimum forward-looking ambition of a Scope 1 or 2 near-term target must be consistent with net-zero by 2050 at the latest, on a linear reduction from your most recent year to 2050. Emissions or intensity must not increase. It is one test of several.

The wording

C14 in the SBTi Corporate Near-Term Criteria: the minimum forward-looking ambition of near-term targets covering Scope 1 and/or Scope 2 is consistent with reaching net-zero by 2050 at the latest, assuming a linear absolute reduction, linear intensity reduction, or intensity convergence between the most recent year and 2050, and not increasing absolute emissions or intensity.

What anchors the line

Reading it as arithmetic (my reading)

For an absolute target, the straight line runs from your most recent year's tonnes to zero in 2050. The yearly step is the most recent year's tonnes divided by the years left. Your target year's tonnes should sit at or below that line. This is my reading of the C14 sentence, not an SBTi worked method. C14 does not say the line ends at exactly zero.

Other tests still apply

C15 asks that Scope 1 and 2 targets be consistent with 1.5 degrees Celsius. C16 requires absolute targets to be at least as ambitious as the minimum of the approved 1.5 degrees scenario range, and C17 requires intensity targets to use an approved sector pathway. In my reading, clearing the line in C14 does not by itself clear those.

Example: most recent year 2025, 1,000 tonnes

Example numbers. In my reading C14 is only a floor; C15 to C17 set the 1.5 degrees test, which asks for a much larger cut by 2030 (see the 42 percent answer).

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so the litres, kilowatt hours and months are in one place to copy from. It does not model target pathways. The monthly records give you the most recent year's tonnes to start from.

Sources: SBTi Corporate Near-Term Criteria, Version 5.3.1, April 2026