Why does the Bureau of Energy Efficiency (BEE) Solapur report for 8 rapier looms print a power saving of 4,680 kilowatt hours when the 4 loom report prints 18,720?

BEE's Solapur reports price 4 rapier looms at rupees (Rs) 27.68 lakh and 8 at Rs 49.81 lakh, with yearly benefits of Rs 12.83 and 25.66 lakh. The 8 loom summary prints 4,680 kilowatt hours (kWh) saved; that is one loom's figure, and eight save 37,440.

The two reports side by side

The 4,680 kWh in the 8 loom summary

The 8 loom summary table says electricity saving 4,680 kWh a year. Its own Table 3.1 and its carbon line say otherwise: 15.6 x 300 x 8 = 37,440 kWh, and the 32 tonnes of carbon dioxide (CO2) it prints is exactly twice the 4 loom report's 16. The 4,680 is one loom's saving. The 4 loom report prints the right total, 18,720.

Other printed figures that do not tie

What the power saving is worth in carbon

The reports print 16 and 32 tonnes, 0.855 tonne of CO2 for each megawatt hour. At the Central Electricity Authority (CEA) grid factor for financial year (FY) 2025-26, 0.675 kilograms a kWh, 18,720 kWh is 12.6 tonnes and 37,440 kWh is 25.3. Power is a small part of the benefit: Rs 11,700 of the Rs 3,20,700 a loom, 3.6%.

Before you buy

Eight looms, rebuilt

Printed lines are the reports' own at the reports' prices (power Rs 2.50 a kWh, a 2010 figure). The 0.675 is the CEA version 22.0 grid factor for FY 2025-26, an estimate of today's saving.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so weaving power is on file by month. It does not read loom meters or production books; add the kilograms woven yourself.

Sources: BEE, Detailed project report: auto loom / rapier loom (4 nos), Solapur textile cluster (SAMEEEKSHA), BEE, Detailed project report: auto loom / rapier loom (8 nos), Solapur textile cluster (SAMEEEKSHA), Central Electricity Authority (CEA), CO2 Baseline Database for the Indian Power Sector

Last reviewed 2026-11-05. Report figures are from BEE's Small and Medium Enterprises (SME) programme project reports, with power at Rs 2.50 a kWh. Check your tariff, your wage bill and a current quote before you rely on the payback.