Why do the Bureau of Energy Efficiency 2 megawatt and 4 megawatt sponge iron waste heat power reports show the same flue gas heat?

Both Bureau of Energy Efficiency (BEE) Odisha reports list the same flue gas heat, 15.65 million kilocalories (kcal) an hour, and the same 22,561 kilograms of steam an hour. One turns it into 2 megawatts (MW), the other into 4. The reports do not show that step, so ask a supplier for it.

What the two reports print

Where the reports part ways

Row 28 of each heat sheet gives power from that steam: 2 MW in one, 4 MW in the other. Neither shows the steam to power sum. The 4 MW report's turbine table also rates the turbine at 4 MW but lists the maximum power generated as 2 MW, and both reports list the same 18 tonnes an hour of turbine inlet steam. Both heat sheets cover 200 tonnes a day although the first report is titled for 100, and the 4 MW report's page headers still read 2 MW. In both, the boiler makes 22,561 kilograms of steam an hour, about 22.5 tonnes, while the turbine takes 18.

The reports do not say why the same steam gives twice the power. Before you read either figure as a forecast, ask the turbine maker for kilowatts at your kiln's actual flue gas flow and temperature.

The money rows

The 499 and 998 lakh in the benefit tables are the units times Rs 3.50 a kWh (14,256,000 x 3.50 = 498.96 and 28,512,000 x 3.50 = 997.92), but the same tables print Rs 3.30 a kWh. At Rs 3.30 the figures are Rs 470 lakh and Rs 940.9 lakh. The 4 MW summary uses 940.90, the Rs 3.30 figure.

Cost and payback also vary inside each report. The 2 MW plant is Rs 725 lakh in the summary, Rs 625 lakh in annexure 2 and Rs 746.03 lakh in the financial annexure; its payback is 18 months in the summary and 1.36 years in annexure 2, which adds operation and manpower cost. The 4 MW report gives 12 months and 1.03 years the same way.

What to carry into a loan file

Grid units displaced, in carbon dioxide (estimate)

Only if the units replace grid power. Grid factor is the Central Electricity Authority (CEA) financial year 2025-26 figure, an estimate.

What Senseible does here

Senseible reads electricity bills and fuel invoices into monthly records, so grid units bought before and after a waste heat plant can be compared month by month. Generation from your own turbine meter is a figure you add.

Sources: BEE, Detailed project report: waste heat recovery power plant 2 MW, 100 tonnes a day, Odisha sponge iron (SAMEEEKSHA), BEE, Detailed project report: waste heat recovery power plant 4 MW, 200 tonnes a day, Odisha sponge iron (SAMEEEKSHA), CEA, CO2 Baseline Database for the Indian Power Sector

Last reviewed 2026-11-04. Report figures are from BEE's Small and Medium Enterprises (SME) programme project reports; costs, tariffs and paybacks are at the report year's prices. Check today's prices and a current quote before you rely on the payback.