The Bureau of Energy Efficiency's (BEE) detailed project report for a 100 tonnes per day (TPD) Odisha kiln estimates that preheating the raw material with hot flue gas saves about 1,965 kg of coal an hour, or 14,145 tonnes a year. It is a 2010 engineering estimate, not a measured result, so check it against your own coal bills.

What the report assumes

How it compares to the kiln's coal use

The report puts a typical 100 TPD kiln at 48,000 tonnes of coal a year, so 14,145 tonnes is about 29 percent. Elsewhere it lists coal at 180 tonnes a day, which over 300 days is 54,000 tonnes and makes the saving about 26 percent. Both sit above the report's own line that at least 20 percent of coal is saved, so treat the headline as a generous estimate and plan on measuring.

What it costs in power

The preheating kiln uses about 1,800 kWh a day, roughly 540,000 kWh over 300 days. The report also says electricity is saved on the forced draft fans and the gas cooling system, but gives no figure for that.

Other effects the report claims

Example: carbon dioxide (CO2) on the report's own numbers (estimate)

Estimate. It uses the report's 14,145 t, the Indian coal factor from India's Second Biennial Update Report (2018) and the Central Electricity Authority grid factor for FY 2025-26. Your own coal per tonne of sponge iron is the real test.

What Senseible does here

Senseible reads coal and electricity invoices into monthly tonnes and CO2 per site, so coal per tonne of sponge iron before and after a retrofit is on record. The saving the report estimates can only be confirmed by your own bills.

Sources: Bureau of Energy Efficiency, Detailed Project Report: Raw material preheating, 100 TPD, Orissa sponge iron cluster (2010)

Last reviewed 2026-11-04. A 2010 estimate with some internal differences; compare with metered coal per tonne after any retrofit.