Senseible

How do the 63 kilovolt-ampere (kVA) and 100 kVA coal gasifier and generator projects for a tea factory compare on coal, diesel, power and payback?

The larger coal gasifier set in the Bureau of Energy Efficiency (BEE) Jorhat reports, 100 kVA, makes 288,000 kilowatt hours a year and saves 205 tonnes of coal, against 181,440 and 137 tonnes for the 63 kVA set. It also burns about 50% more diesel for each kilowatt hour made.

What the project is, in plain words

A gasifier heats coal with very little air, so the coal gives off a burnable gas instead of burning outright. The gas feeds a diesel generator that has been changed to run on gas and diesel together (dual fuel), so it needs less diesel. A kVA is the size rating of a generator, like the engine size on a car.

Two more things happen in the reports. The hot exhaust of the generator warms the drying air, and the coke left after gasification is burnt in the dryer's air heater instead of coal. So the factory gets power and saves coal from one plant.

The two sizes side by side

Diesel per unit of power is not the same

The 63 kVA set burns 2.5 litres for 50.4 kW, which is 0.050 litres for each kWh. The 100 kVA set burns 6 litres for 80 kW, 0.075 litres for each kWh, about 50% more. The reports do not explain the difference, so ask the supplier what diesel share you should expect at your load.

Diesel takes 17% of the gross benefit in the 63 kVA case (Rs 3.42 lakh of Rs 19.67 lakh) and 27% in the 100 kVA case (Rs 8.21 lakh of Rs 30.69 lakh). The bigger set still pays back faster, because cost rises 23% (23.08 / 18.72) and net benefit rises 38% (22.48 / 16.25).

Where the reports do not match themselves

The carbon dioxide line

The 100 kVA project, line by line

These are the reports' printed figures with our own arithmetic on top. Prices are the reports' 2010 prices. The CO2 line is our reading at current factors, not a figure either report prints.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so the drop in bought coal and grid power after a gasifier shows on your own bills. Meters for the gasifier's gas output and the generator's hours can be added as a custom service, on request. Meanwhile keep those logs yourself.

Sources: BEE and SAMEEEKSHA detailed project report: coal gasification for thermal and 100 kVA captive generation, Jorhat tea cluster, BEE and SAMEEEKSHA detailed project report: coal gasification for thermal and 63 kVA captive generation, Jorhat tea cluster, CEA CO2 Baseline Database for the Indian Power Sector, version 22.0 (FY 2025-26 grid factor)

Last reviewed 2026-11-07. Costs and paybacks are at the reports' 2010 prices. The diesel per kWh figures and the CO2 reading at current factors are our own arithmetic on the reports' printed numbers. Ask suppliers for a written guarantee of coal, diesel and power at your load.