Senseible

Why do my refrigerant top-up records look low after I installed many new units?

A top-up record shows a leak only when a technician refills the unit. The Intergovernmental Panel on Climate Change (IPCC) warns that mass balance can underestimate emissions when equipment stocks are growing, because a lag separates the leak from the service that detects it.

What the IPCC says

The Guidelines list as a drawback of the mass-balance approach that it "can underestimate emissions when equipment stocks are growing, because there is a lag between the time the emissions occur and the time they are detected (through equipment servicing)". They add that the underestimate is relatively large where hydrofluorocarbons (HFCs) have been used for less than ten years, "because much of the equipment will have leaked without ever being serviced", and gets smaller the longer HFCs are used. The statement is about a country. Applying it to a site that has just added many units is our reading.

What it looks like in your records (our reading for a site)

What to do

  1. Keep reporting actual top-ups. The Guidelines ask for the same method and data sources every year.
  2. List units not yet serviced, with nameplate charge and install date.
  3. Work out the Table 7.9 screening range for them and note it beside the figure as a cross-check, not an addition to the total.
  4. When the first service happens, label the top-up as covering more than one year.

20 split air conditioners installed in early 2024, first serviced in January 2026

Units, charge and dates are examples. Table 7.9 is a 2006 national default.

What Senseible does here

Senseible reads fuel invoices and electricity bills into dated records. It does not read recovery notes, service tickets or equipment nameplates, so keep those papers yourself and add the kilograms to your Scope 1 figure.

Sources: IPCC 2006 Guidelines, Volume 3, Chapter 7: Emissions of Fluorinated Substitutes for Ozone Depleting Substances, IPCC Sixth Assessment Report, Working Group I, Chapter 7 Supplementary Material, Table 7.SM.7

Last reviewed 2026-11-05. The lag warning is written for national inventories. Its use for one site is our reading.