Senseible

What diversion rate do zero waste to landfill certifications require?

The main schemes start at 90% diversion by weight. UL 2799 grades a site Silver at 90 to 94%, Gold at 95 to 99% and Platinum at 100%. TRUE certification also needs 90% or more, but it counts waste sent to incineration, including waste-to-energy, as not diverted.

How the diversion rate is calculated

Diversion rate = waste diverted from landfill / total waste generated x 100, by weight, over a 12 month period. Reuse, recycling and composting count as diverted in every scheme. Open dumping and burning without energy recovery never count. Energy recovery is where schemes differ.

UL 2799 and TRUE side by side

Indian waste streams that often break the claim

Evidence a validator asks for

Worked example: one site, one year, two schemes

Figures are illustrative. Hazardous waste sent to a secure landfill belongs in the landfilled total.

What Senseible does here

Senseible keeps waste contractor invoices in its Scope 3 supplier evidence trail with a SHA-256 fingerprint per file, which helps when a validator asks for disposal records. The diversion audit and the zero waste claim itself come from the scheme's validator.

Sources: Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 (CPCB), Solid Waste Management Rules, 2026 (MoEFCC), in force from 1 April 2026, replacing the 2016 Rules

Last reviewed 2026-10-17. UL 2799 and TRUE revise their criteria; confirm the current edition, especially how each treats waste-to-energy and co-processing.