How does an EU buyer get a CBAM figure for hot rolled coil from Bokaro?
Ask the mill for embedded emissions per tonne of coil, built from its sinter plant, blast furnace and steel shop, plus any bought precursors. Integrated mills run high, so a measured figure usually beats the EU default. Without one, the importer must use default values.
What goes in
- Sinter and pellet plants inside the works, including their electricity. The coke ovens stay out (EU CBAM Q&A 6.4); coke and coke oven gas count where they are burnt.
- Blast furnace and converter.
- Reheating and rolling fuel.
- Bought pig iron, pellets or slabs as precursors. Coke is not a precursor.
What to send
One figure per tonne of coil, the reporting period, and the method. For steel only direct emissions count, plus the electricity of a sinter or pellet plant, which carries in as a precursor.
Verification
Actual figures need verification by an accredited verifier before an importer can use them for the definitive regime.
What Senseible does here
Senseible keeps each site's fuel, power and production records together, so the embedded emissions you send an EU importer trace back to dated documents.
- Pohang hot rolled coil
- Hot rolled coil and indirect emissions
- CBAM calculator
- CBAM for Indian exporters
- CBAM cost for Indian steel exporters
Sources: Regulation (EU) 2023/956 (CBAM Regulation), consolidated, European Commission, CBAM definitive regime, worldsteel, CO2 data collection methodology, European Commission, CBAM Questions and Answers, European Commission, Guidance 5d: iron and steel