Per tonne of pipe, take the coil you consumed per tonne times the coil's embedded emissions, then add your mill's own direct emissions per tonne, such as gas burnt in normalising, annealing or galvanising furnaces. For steel, electricity for welding and forming is not counted. In most pipe mills the coil figure dominates.

Why pipes are a complex good

Tubes and pipes under headings 7304 to 7306 are iron and steel goods in Annex I of the CBAM Regulation. A pipe made from bought hot-rolled coil is a complex good: its embedded emissions are your own process emissions plus the embedded emissions of the coil, which is the relevant precursor. Annex IV of the regulation sets this method, and the definitive-period implementing rules give the detail.

What counts as your own direct emissions

Getting the coil figure

Ask each coil supplier for the specific embedded emissions of the coil it shipped you, per tonne, with its reporting period. If a supplier cannot give it, use the official default value for that coil's CN code and country of origin, which includes the mark-up set in Implementing Regulation (EU) 2025/2621. Keep the supplier's communication with the coil invoice.

Yield losses stay with the pipe

Slitting edges, end cuts, trim and rejected lengths mean you consume more coil than you despatch as pipe. Charge all coil consumed in the period to the good pipe produced, unless the mill makes other goods from the same coil, in which case share by tonnes. Measure the ratio from coil issued to production and pipe despatched, not from a design figure.

Worked example: one year at an ERW pipe mill

The coil share is 97 percent here. Better coil data moves the result far more than any change at the pipe mill.

What Senseible does here

Senseible's CBAM cost calculator applies default values and mark-ups to estimate certificate cost. It reads the pipe mill's fuel and power bills, which give the own-process share, and coil supplier statements can be kept with the coil invoices.

Sources: Regulation (EU) 2023/956 (CBAM), Annexes I, II and IV, Commission Implementing Regulation (EU) 2023/1773, Annex II (precursors), and the definitive-period implementing rules, Commission Implementing Regulation (EU) 2025/2621 (default values)