What must a factory measure and keep to monitor a BM IN02.001 energy efficiency or fuel switch project?

BM IN02.001 projects work out their reductions from measured fuel, electricity and, where heat is the saving, steam data, using BEE tools BM-T-002 for fuel and BM-T-003 for electricity. The exact parameter list, units and frequencies sit in the methodology's monitoring section, so read that first and set up meters and records to match.

What the methodology and its tools point to

Records that sit behind each number

A verifier checks each monitored value against a primary record. For fuel that means purchase invoices, stock registers and daily consumption logs. For electricity it means discom bills plus sub-meter readings for the equipment itself, since the main bill covers the whole plant. For steam or output it means the boiler log and production or dispatch registers.

Keep the calibration certificate for every meter you rely on, with the last and next calibration dates. If BM IN02.001 or the tools set a calibration frequency or a rule for out-of-calibration readings, follow that.

Set this up before the project starts

  1. Download the version of BM IN02.001 you will register under from beeindia.gov.in, with BM-T-002 and BM-T-003, and list every parameter with its unit, source and frequency.
  2. Install and calibrate sub-meters on the equipment being replaced, so you have a measured period before the change.
  3. Fix who records each reading and where it is stored; a monitoring report written from memory will not pass.
  4. Keep the same method every period, and note any change to meters or lab procedures with its date.

Illustrative month: furnace oil to PNG switch

Simple arithmetic with IPCC 2006 default factors to show which records feed the figure. It is not the BM IN02.001 equation: the registered methodology sets its own baseline, defaults and deductions, which change the result.

What Senseible does here

Senseible reads your fuel invoices, fuel slips and electricity bills into a dated monthly record, with a SHA-256 fingerprint on every file, so the fuel and electricity figures in a BM IN02.001 monitoring report have a bill-backed trail. Meter calibration certificates and production registers come from your plant records.

Sources: BEE, BM IN02.001 Energy efficiency and fuel switching measures for industrial facilities (version 1.0, 27 March 2025), tools BM-T-002 and BM-T-003 (beeindia.gov.in), IPCC 2006 Guidelines, Volume 2 (Energy), default fuel factors

Last reviewed 2026-10-18. BM IN02.001 version 1.0 (27 March 2025) refers to BM-T-002 and BM-T-003 and allows thermal energy to be monitored through fuel and steam parameters; its data and parameters tables were not readable when checked on 18 October 2026, so no parameter list is quoted. BEE's approved list was last updated 7 July 2026. Confirm the version in force before registering.