Yes, if it is imposed. The Green Energy Open Access Rules, 2022 allow a minimum number of time blocks, not more than twelve, in which you shall not change the quantum drawn. They do not say who imposes it, so check your state regulation and approval order. Use above the quantum comes from the discom at the grid factor.

What the Rules allow

What a hold does to your Scope 2 numbers

Our reading, not a line from the Rules: during a hold your scheduled open access units stay fixed while your plant load moves. The two can differ in both directions.

If you use less than the scheduled quantum, the surplus goes to banking or to whatever your state's rules say for surplus. It covers none of your consumption unless the discom adjusts it against your load. See the banking and deviation pages.

If you use more, the extra comes from the discom at the factor you use for uncovered grid units.

The Greenhouse Gas Protocol Scope 2 Guidance asks that instruments be issued and redeemed as close as possible to the period of energy consumption. Our reading: a fixed quantum that does not follow your load is where that test gets tight.

What to keep

A twelve-block hold, two ways

The figures are an example. The grid factor 0.675 kg CO2 per kWh is for financial year 2025-26.

What Senseible does here

Senseible keeps electricity bills and renewable purchase records side by side, so location-based and market-based Scope 2 figures can be reported from the same data. Add scheduled and metered quantities from your discom statement. Certificate retirement proof stays with the buyer.

Sources: Ministry of Power, Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, Gazette notification of 6 June 2022, Greenhouse Gas (GHG) Protocol, Scope 2 Guidance (2015), Table 7.1 Scope 2 Quality Criteria and Chapter 10