If the grid is down and my rooftop solar cannot export, does the electricity distribution company pay for the lost units?

No. The Ministry of New and Renewable Energy (MNRE) model net metering agreement says the distribution licensee shall not be liable to compensate the consumer if the rooftop system cannot inject surplus power because of a failure of power supply in the grid or network. The consumer also bears the plant and net meter costs.

The clauses that matter

This comes from the model net metering agreement in Annexure 4 of MNRE's guidelines for its residential rooftop solar scheme, Pradhan Mantri Surya Ghar: Muft Bijli Yojana. Your state's own agreement may differ, so read the one your distribution company offers you.

What you are left with

How to plan for it

Include a rough outage allowance in your payback sums. If your area has long daytime cuts, the plant earns less than a simple yield figure says. My reading: a plant that cannot run in an outage also protects line workers, which is the reason the specification requires it to switch off, so the loss is a built-in feature of a grid-tied design and not a fault in the plant.

Keep a log of outage dates and times from the factory, so that a low generation month can be explained to a lender or verifier.

How cuts reduce a year's units (example numbers)

All figures are example numbers; my reading is that the lost units are the plant owner's loss, in the same way clause 8.2 treats surplus that cannot be injected.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so the grid units you buy each month are on file before and after the plant goes live. It does not review agreements or log outages.

Sources: Ministry of New and Renewable Energy (MNRE), Guidelines for PM-Surya Ghar: Muft Bijli Yojana, Central Financial Assistance to Residential Consumers, with Annexures 2 to 4

Last reviewed 2026-11-06. Re-check clause numbers and figures against the current version of the guidelines before you rely on them. The model net metering agreement is Annexure 4; your state's own agreement may differ, so read the one you are offered.