Will my grid-connected rooftop solar keep running during a power cut?

No, not a standard grid-connected plant. The Ministry of New and Renewable Energy (MNRE) specification requires inverters attached to the grid to turn off in a short period when the grid fails, and the plant must have islanding protection. A plant that keeps running in an outage needs a different design.

What the specification says

These are clauses from the technical specification in Annexure 3 of MNRE's guidelines for its residential rooftop solar scheme, Pradhan Mantri Surya Ghar: Muft Bijli Yojana. A factory is not bound by them, but they are a published checklist to hold a quotation against.

What that means on your shop floor

For a grid-tied plant, at noon on a day the grid trips, the roof may be making power but the inverter switches off and your lines go dark, so the diesel generator starts if you have one. My reading: solar by itself does not cut your generator hours in an outage, though it cuts the units you buy on the days the grid is up. To ride through a cut you need a design with a battery or a hybrid arrangement. The scheme text lists battery hybrid systems among the non-export types, but the choice of equipment and the approval route are for your designer and your state regulator.

Questions to put to the vendor

What an outage costs a grid-tied plant (example numbers)

Output and duration are example numbers. Diesel burnt in the generator is Scope 1.

What Senseible does here

Senseible reads electricity bills into monthly records, so the units you import month by month sit in one place. It does not size batteries or backup systems.