Is rooftop solar with no export to the grid allowed, and what does the electricity distribution company check?

The Ministry of New and Renewable Energy (MNRE) scheme treats systems that are connected to the grid but do not feed into it, including behind-the-meter and battery hybrid systems, as grid connected. For the subsidy, they need the state regulator's approval, and the distribution company inspects that reverse power relay protection works.

What the guideline says

This comes from the main text of MNRE's guidelines for its residential rooftop solar scheme, Pradhan Mantri Surya Ghar: Muft Bijli Yojana. It is written for residential connections, so treat it as a model for a factory, with your state's rules as the authority.

What that means for a factory

The subsidy itself is for residential connections, so it does not apply to a factory. My reading is that the same three ideas still tell you how a no-export plant is seen: it stays a grid-connected plant, the regulator's approval comes first, and the discom checks a reverse power relay, which is the protection that stops power flowing back out to the grid. The state's own rules decide the details, so ask your discom for its zero-export procedure in writing.

What to put in the quotation

For your carbon figures

With no export, every unit made is used on site, so your grid import falls by the plant's whole output. Scope 2 is still the imports on the bill times the grid factor. Keep the monthly generation record, because the bill will not show it.

A no-export plant over one month (example numbers)

Use and generation are example numbers. 0.675 kilograms of CO2 per kWh is the Central Electricity Authority grid factor for financial year 2025-26.

What Senseible does here

Senseible reads electricity bills into monthly records, so the units you import month by month sit in one place. It does not file approvals or test relays.

Sources: Ministry of New and Renewable Energy (MNRE), Guidelines for PM-Surya Ghar: Muft Bijli Yojana, Central Financial Assistance to Residential Consumers, with Annexures 2 to 4, Central Electricity Authority (CEA), CO2 Baseline Database, India grid factor for financial year 2025-26

Last reviewed 2026-11-06. Re-check clause numbers and figures against the current version of the guidelines before you rely on them. Approval for a behind-the-meter plant depends on your state commission, so check its current rules.