Three Bureau of Energy Efficiency (BEE) Jorhat reports replace a tea dryer blower motor of 15, 18.5 or 22 kilowatts (kW) for rupees (Rs) 0.79, 1.01 and 1.13 lakh. They save 3,672, 4,110 and 5,400 kilowatt hours (kWh) a year and print paybacks of 2.93, 3.26 and 2.83 years.

The three reports side by side

Why the 15 kW report looks so good for its size

The saving is a share of what the blower draws. At 15 kW it is 1.02 of 9.94 kW, about 10.3%. At 18.5 and 22 kW it is 1.142 of 14.31 and 1.50 of 18.70, about 8.0% each. The 15 kW report assumes a worse old motor, 83.5% against 86.5%, so it books a bigger efficiency gain of 9.5 points against 7.5.

Check which efficiency your old motor really has before you pick a report. The reports say most of these motors have been rewound more than two or three times, which does not tell you your own motor's efficiency.

Printed figures that do not tie

Before you order

The 18.5 kW report as printed, then at its own measured draw

Printed lines are the report's own. The last two lines are an example of my own reading, using the report's inputs.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so your monthly units are on file next to a report's yearly kWh. A bill covers the whole factory, so the blower's own draw still needs a meter. The green loan check shows what a lender asks for.

Sources: BEE, Detailed project report: energy efficient motor 15 kW in dryer hot air blower, Jorhat tea cluster (SAMEEEKSHA), BEE, Detailed project report: energy efficient motor 18.5 kW in dryer hot air blower, Jorhat tea cluster (SAMEEEKSHA), BEE, Detailed project report: energy efficient motor 22 kW in dryer hot air blower, Jorhat tea cluster (SAMEEEKSHA), Central Electricity Authority (CEA), CO2 Baseline Database for the Indian Power Sector

Last reviewed 2026-11-05. Report figures are from BEE's Small and Medium Enterprises (SME) programme project reports, at 2010 prices and a Rs 7.45 a kWh blended power cost (70% grid, 30% diesel generator). Check today's power cost and a current quote before you rely on the payback.