Senseible

Should a steel plant count mine methane on coking coal from Moatize?

Yes, in Scope 3 category 1 for the coal. Moatize coal is mined mostly from open pits, so without mine data the IPCC surface mining default of about 1.2 cubic metres of methane per tonne applies. Add diesel, rail to the port at Nacala or Beira, and sea freight.

The default

The rest of the chain

Diesel for mining, rail to the port and the voyage to your plant. Ask the trader for the mine, port and voyage.

Not in CBAM

Mine methane is upstream and stays out of the CBAM steel figure, but buyers reporting a full footprint include it.

What Senseible does here

Senseible turns supplier invoices into a Scope 3 record with the supplier, quantity and factor behind every figure, so you can see which supplier data is still missing.

Sources: 2006 IPCC Guidelines, Volume 2: Energy, GHG Protocol Corporate Value Chain (Scope 3) Standard

Last reviewed 2026-10-21.